Skip to main content
High End Kitchen Remodel
Same crew from demolition to dinner.

High End Kitchen Remodel on Long Island

For homeowners who want the kitchen done without compromise: full custom cabinetry, natural stone, integrated appliance panels, and the millwork detail that separates a high-end kitchen from an expensive one.

Licensed & Insured

Nassau HIC #198901

4.9 ★ Average Rating

156 verified reviews

Licensed & Insured

Kitchen & Bath Assoc.

450+ Kitchens

Since 2007

What's Included

Full custom cabinetry, not semi-custom
Natural stone or premium quartz surfaces
Integrated and panel-ready appliances
Custom millwork, trim and ceiling detail
Designer lighting plan
Specialty storage and interior fittings
Structural changes where the layout needs them
Full project management through completion

About This Service

A high end kitchen remodel is a different project from a standard renovation, and the difference shows up in the cabinetry more than anywhere else. Full custom cabinetry is built to your dimensions, which means an awkward Long Island footprint stops being a constraint you design around.

The rest follows from there: natural stone with book-matched seams, appliances integrated behind panels, and the millwork and trim detail that makes the room read as designed rather than assembled. Expect 10 to 16 weeks of construction, with custom cabinetry ordered well ahead of the start date.

Pricing

$90,000 - $250,000+

Typical range for Long Island projects. Includes materials, labor, and permits.

Get Your Quote Try Our Calculator

High End Kitchen Remodel FAQ

Mostly cabinetry and detail. Full custom cabinetry is built to your exact dimensions rather than assembled from stock sizes, which changes what is possible in an awkward footprint. Beyond that it is the millwork, the integrated appliances, and the finish detail around them.

Plan on 10 to 16 weeks of construction once cabinetry arrives, and custom cabinetry itself is typically a 10 to 14 week lead time from order. Design and specification run ahead of both.

Yes. Removing walls, relocating plumbing and electrical, and reframing openings are all normal on a project at this level. Those changes require permits, which we file and see through inspection.

Completed kitchen project
Our crew at work
Backsplash detail
Open concept kitchen
Kitchen reveal
Farmhouse kitchen

Start Your Project

Ready to Transform Your Kitchen?

Get a free design consultation and detailed estimate. No pressure, no obligation.

0+

Kitchens Done

4.9

Average Rating

2hr

Callback Time

(631) 565-8128

Get Your Free Kitchen Estimate

Or call us now: (631) 565-8128 · Mon-Sat 7-6